Also, you can see the trenches have been dug for the geo thermal lines, which are located on the front hill, beside the driveway.
The windows have all been covered with plastic in preparation for the plastering.
Fingers crossed that the well is finished soon so the plastering can begin!
No comments:
Post a Comment